Details :Damage material as per photographs and available details so check carefully all details and photos properly (Taxes – Inclusive) GSTIN is mandatory. Reserve of case in beased on per pcs
Details :LOSS BY OVERTURNING DURING TRANZIT, KINDLY INSPECT THE MATERIAL PHYSICALLY, FOR PHYSICAL INSPECTION BUYER NEED TO CONFIRM BEFORE 1 DAY, PAYMENT SHOULD BE COMPLETED WITH 2 DAYS AFTER RECEIVING ACCOUNT DETAILS AND MATERIAL SHOULD BE LIFTED WITHIN 5 TO 6 DAYSÂ AFTER RECEIVING LIFTING CONFIRMATION. To be lifted in as is where is condition, buyer to arrange the labor and packing for loading unloading and packing or tins from their end
Details :Material will be handed over as is where is condition, material to be lifted on Priority, with a reserve price of Rs.46/- per kg (All Inclusive)
Details :Reserve Price 740 per Kg (All Inclusive) Without brand name and in scrap condition so please see material physically for better understanding.