Details :The winning buyer must lift the below material at the specified rates, inclusive of all taxes Lamps – Rs.150 per kg (all inclusive) Lamp-11811kg Ash – Rs.65 per kg (all inclusive) Ash -9463kg branding will not be provided To be lifted in as is where is condition, buyer to arrange the labor for loading /unloading and packing from their end.
Details :Material will be handed over as is where is condition, material to be lifted on Priority, with a reserve price of Rs.46/- per kg (All Inclusive)
Details :LOSS BY OVERTURNING DURING TRANZIT, KINDLY INSPECT THE MATERIAL PHYSICALLY, FOR PHYSICAL INSPECTION BUYER NEED TO CONFIRM BEFORE 1 DAY, PAYMENT SHOULD BE COMPLETED WITH 2 DAYS AFTER RECEIVING ACCOUNT DETAILS AND MATERIAL SHOULD BE LIFTED WITHIN 5 TO 6 DAYS AFTER RECEIVING LIFTING CONFIRMATION. To be lifted in as is where is condition, buyer to arrange the labor and packing for loading unloading and packing or tins from their end